McLean Environmental Services McLean Environmental Services McLean Environmental Services
McLean Environmental Services McLean Environmental Services McLean Environmental Services
Home
Customer Commitment
Qualifications
Company Background
Services
Project Experience
Newsletter
Contact Us

Asbestos Surveys and Management Plans

OSHA regulation require that certain materials found in buildings constructed no later than 1980 be presumed to be Asbestos Containing Material (ACM), unless proven otherwise through laboratory analysis. Additionally, the EPA requires that a comprehensive asbestos survey be preformed on public/commercial buildings, regardless of the date of construction, prior to any renovation, dismantling, or demolition activities which may disturb potential ACM.

If present in occupied buildings, ACM does not necessarily have to be removed. If fact, maintaining asbestos in place is often more cost effective and desirable than removal. If left in place, ACM should be managed in accordance with an Operation and Maintenance plan designed by a licensed Management Planner. MES inspectors are Texas and Louisiana licensed Asbestos Inspectors and Management Planners.

For the latest, up-to-date information on asbestos and its link with mesothelioma, please check out The Asbestos & Mesothelioma Center website.

SERVICES PROVIDED:

bullet Asbestos Surveys
bullet Operation & Maintenance Programs
McLean Environmental Services
Site Designed By: BoomerLang Web Design